A bathroom remodel is a very exciting update for your home, and asking yourself “how long does a bathroom remodel take?” now will help you to be as prepared for the project as you can be. Whether you plan to make minor updates or completely overhaul the space, the timeline for a bathroom renovation can vary based on the project’s scope, materials, and potential complications. 

In this guide, we will lay out the average timeline for a bathroom remodel from start to finish. That way you can plan effectively and set realistic expectations for how long the process will take. If you feel uncertain about the timeframe for your project even after reading this, feel free to reach out to us for a customized estimate.

How long does a bathroom remodel take?

Planning and Design (1-3 Weeks):

The planning and design phase is crucial to the success of your bathroom remodel. During this time, you’ll work with us to outline your vision and make important decisions about the layout, materials, and overall style. This phase starts with an initial consultation where you discuss your goals, budget, and timeline. After that, you will select finishes such as tiles, fixtures, cabinetry, and lighting.

At this stage, it’s also essential to secure any necessary permits from local authorities. Depending on the complexity of your remodel and your location, acquiring permits can take anywhere from a few days to a couple of weeks. Being thorough in the planning process ensures the rest of the project runs smoothly and on time.

 

Demolition and Preparation (1-3 Days):

Once the crew removes the old materials, they prepare the space for construction. This phase involves clearing out the old bathroom by removing existing fixtures, such as sinks, toilets, bathtubs, and cabinetry, along with tearing out tiles, flooring, and possibly drywall. Time spent in this phase depends on the size of the bathroom and the complexity of the remodel and demolition.

After the old materials have been removed, the space is prepared for construction. This includes making sure the area is clean and ready for new installations. The team will address any necessary repairs to the subfloor or walls during this stage to ensure a solid foundation for the upcoming work.

 

Plumbing and Electrical Work (2-4 Days):

Once demolition is complete, the plumbing and electrical work begins. In this phase, the plumbers may update or relocate plumbing lines for new fixtures like sinks, showers, bathtubs, and toilets. It also includes installing or upgrading electrical systems, such as lighting, fans, and outlets. If you’re adding new features like smart technology or eco friendly options, this is the time to get everything wired.

The complexity of the plumbing and electrical work depends on the scope of your remodel. For a simple refresh, it may only take a couple of days. However, for more extensive projects involving significant layout changes, this phase can take a bit longer. Additionally, if inspections are required, they usually occur during or after this phase to ensure everything is up to code before moving forward.

Framing and Drywall (2-3 Days)

After the plumbing and electrical work is completed and inspected, the next step is framing and drywall installation. If you plan to change the layout of your bathroom or add new features, framing will be needed to support new walls or structures. Adding a shower enclosure or additional storage space are examples that would require this kind of work. 

Once the framing is complete, drywall is installed on the walls and ceiling. Next, it will be taped and mudded to create a smooth, seamless surface, ready for painting or tiling in the next stages. This step typically takes 2-3 days, depending on the complexity of the layout changes.

how long does bathroom remodel take?

Tiling and Flooring (4-6 Days)

The tiling and flooring phase is one of the more time-consuming parts of the remodel, as it requires precision and attention to detail. Whether you’re installing new tiles for the walls, flooring, or shower, this process can take several days. After the tiles are laid, grout is applied, and the tiles are sealed to ensure durability and water resistance.

If you’re opting for non-tile flooring, such as vinyl or wood, the installation time may be shorter, depending on the materials used. However, it’s important to allow adequate time for the grout and any adhesives to fully set before moving forward. On average, tiling and flooring take 4-6 days to complete.

Installing Fixtures and Cabinetry (2-4 Days)

After completing the tiling and flooring, the contractors install the new fixtures and cabinetry. This includes installing the new toilet, shower, bathtub, sink, vanity, and cabinets. Depending on your design, you may also be adding custom-built shelves or storage units. Plumbing connections are finalized during this phase to ensure all the fixtures are functioning properly.

Contractors typically complete the fixture and cabinetry installations in 2-4 days, depending on the complexity.

Painting and Finishing Touches (2-3 Days)

With the major elements in place, the next step is painting the walls and ceiling. Fresh paint can dramatically enhance the appearance of the bathroom and tie together the design elements. In addition to painting, this is the time to add final touches such as installing mirrors, towel bars, lighting fixtures, and other accessories that personalize your space.

Painting and adding finishing details typically take 2-3 days, depending on the amount of work required.

Final Inspection and Clean-Up (1-2 Days)

Before your bathroom remodel is officially complete, a final inspection may be required, depending on your local regulations. This ensures that all work meets building codes and safety standards. Once inspectors approve the work, the crew begins the final clean-up, removing debris and construction materials, and ensuring that your new bathroom is clean, polished, and ready for use..

This final stage usually takes 1-2 days, and once this is done, your new bathroom is ready for use!

Potential Delays and How to Avoid Them

No remodel is completely free from the possibility of delays. Common delays include backordered materials, permit issues, or unforeseen structural problems. The benefit of working with experienced contractors is that they are familiar with local regulations, have a strong network of suppliers, and are used to running into unforeseen problems and are equipped to handle them. All of which can help keep your project on track. 

Conclusion

Every bathroom remodel timeline will differ slightly depending on the scope of the project and any unforeseen challenges that arise. By understanding each phase of the remodel, from planning and demolition to tiling, installation, and final inspections, you can get a good idea of realistic expectations for your timeline. With careful planning and the right team, your bathroom renovation can be a smooth process that transforms your space into the bathroom of your dreams. 

Ready to get started with your bathroom remodel? Contact us at Green Group Remodeling to discuss your bathroom remodel plans and get an estimated timeline for your project from start to finish!